Iron rail on stone sleepers, the railroad operated between 1834 and 1854, it was the first railroad through the Allegheny Mountains of Pennsylvania near Gallitzen, Pa. (101273)*
Tags: jmstrain train railroad railway allegheny portage pennsylvania national park
© All Rights Reserved
View of the reproduction track with the historic Lemon House in the background, it was operated at the time as a tavern. The railroad operated between 1834 and 1854, it was the first railroad through the Allegheny Mountains of Pennsylvania near Gallitzen, Pa. (101272)*
Tags: jmstrain train railroad railway allegheny portage pennsylvania national park
© All Rights Reserved
Engine house 6 exhibition building with the reproduction pulleys and gears, the railroad operated between 1834 and 1854, it was the first railroad through the Allegheny Mountains of Pennsylvania near Gallitzen, Pa. (101280)*
Tags: jmstrain railroad railway pennsylvania allegheny portage gallitzen
© All Rights Reserved
Engine house 6 exhibition building, the railroad operated between 1834 and 1854, it was the first railroad through the Allegheny Mountains of Pennsylvania near Gallitzen, Pa. (101268)*
Tags: jmstrain railroad railway pennsylvania allegheny portage gallitzen
© All Rights Reserved
The Lemon House which was built by Samuel Lemon between 1830 & 1832 and became the family residence. It was also used as a Tavern during 1834 to 1847 for railroad passengers as well as travelers on the Northern Turnpike @ Galltizin, Pa. (178013)*
Tags: pennsylvania allegheny portage railroad lemon house national historic site railroad railway jmstrain
© All Rights Reserved