cap bank used for power factor correction 13kv side

Tags:   substation massachusetts 13kv capacitor

N 3 B 687 C 0 E Oct 12, 2010 F Oct 27, 2010
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

a115kv to 13kv sub in medway ma.

Tags:   substation massachusetts 115kv

N 6 B 569 C 1 E Dec 11, 2010 F Feb 19, 2011
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

Tags:   connecticut railroad 11kv electric

  • DESCRIPTION
  • COMMENT
  • MAP
  • O
  • L
  • M

23kv to 4kv. 13kv was later used as primary voltage when the 23kv was taken out.1978.

Tags:   4kv 23kv substation longisland old

N 4 B 2.3K C 1 E Mar 2, 2011 F Mar 7, 2011
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

capacitors on 69kv section of substation. There have been some changes to this since the last photo. Islip,ny

Tags:   Picnik substation longisland 69kv capacitor