The next day these signals would be removed from service and torn down after at least 80 plus years of service. This is one of the older PRR structures as noted by the Xs on the bridge. Haysville PA
© All Rights Reserved
After the top section of the signalbridge was torched off, the lifts dropped the section onto the rails so the signals could be cut off.
© All Rights Reserved
With the N&W heritage leading the way. Lucky to have sun as it was heavily pouring an hour earlier
© All Rights Reserved
© All Rights Reserved
© All Rights Reserved