A closeup of the alignment under construction near NE 115th Street in Seattle. The building lower center with the wrap around it is the 72-unit Northgate West Condominiums. Northgate Station just to the south (right) of this photo. This is where the alignment transitions from the elevated Northgate Station to at-grade along I-5
A look northeast at the future "Shoreline South/148th" station. The football field of the Lakeside school is visible in the lower left. Towards the upper left the alignment transitions away from the elevated alignment to at-grade
© All Rights Reserved
A look south at the future "Shoreline North/185th" station. At the top of the photo the transition between elevated tracks and at-grade tracks is visible. This angle also shows the station butting up directly to single family residences. Shoreline Stadium is visible on the right side of the photo
The existing Mountlake Terrace Station is seen here. The partially constructed elevated track can be seen as it departs the edge of the I-5 lanes and enters the area where the station will be built. On the extreme left the alignment can be seen being constructed over the travel lanes of I-5