Waterfoot
On Wednesday morning I cut a hole out in the wall, we then threaded the beam through the hole, and propped it. I then dropped the doorway opening; and I took out the fireplace in the background.
Of course the bricks that were taken out needed stacking (ready for cleaning, and re-use). The debris needed taking down the stairs to the skip outside. This is the first floor of the building.
On Thursday morning I straightened up the sides of the door opening, ready to take the lintels next week. I can then wall up above the lintels, remove the beam and take out the props.
I started to wall up the fireplace opening in the background too.
Waterfoot
Lancashire