Final testing of the Soyuz launch site at Europe’s Spaceport in French Guiana began on 29 April 2011 with a simulated launch campaign that will end on 5 May 2011.

This dry-run ensures that the Soyuz and the new facilities work together perfectly, while allowing the teams to train under realistic launch conditions. It also validates all the procedures during the final phase before launch.

The vehicle was transferred from the preparation building to the launch zone and erected into the vertical position. The mobile gantry was then rolled out to the pad and the vehicle’s upper composite, comprising the Fregat upper stage and payload fairing, was hoisted on top of the launcher.

Credits: ESA - S. Corvaja, 2011

Fore more information: www.esa.int/SPECIALS/Launchers_Access_to_Space/SEM6JRS4LZ...

Tags:   ESA European Space Agency european space agency Soyuz rocket launcher dry-run spacecraft Europe's Spaceport

N 5 B 3.7K C 0 E Apr 29, 2011 F May 3, 2011
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

Final testing of the Soyuz launch site at Europe’s Spaceport in French Guiana began on 29 April 2011 with a simulated launch campaign that will end on 5 May 2011.

This dry-run ensures that the Soyuz and the new facilities work together perfectly, while allowing the teams to train under realistic launch conditions. It also validates all the procedures during the final phase before launch.

The vehicle was transferred from the preparation building to the launch zone and erected into the vertical position. The mobile gantry was then rolled out to the pad and the vehicle’s upper composite, comprising the Fregat upper stage and payload fairing, was hoisted on top of the launcher.

Credits: ESA - S. Corvaja, 2011

Fore more information: www.esa.int/SPECIALS/Launchers_Access_to_Space/SEM6JRS4LZ...

Tags:   ESA European Space Agency european space agency Soyuz rocket launcher dry-run spacecraft Europe's Spaceport

N 3 B 3.2K C 0 E Apr 29, 2011 F May 3, 2011
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

Final testing of the Soyuz launch site at Europe’s Spaceport in French Guiana began on 29 April 2011 with a simulated launch campaign that will end on 5 May 2011.

This dry-run ensures that the Soyuz and the new facilities work together perfectly, while allowing the teams to train under realistic launch conditions. It also validates all the procedures during the final phase before launch.

The vehicle was transferred from the preparation building to the launch zone and erected into the vertical position. The mobile gantry was then rolled out to the pad and the vehicle’s upper composite, comprising the Fregat upper stage and payload fairing, was hoisted on top of the launcher.

Credits: ESA - S. Corvaja, 2011

Fore more information: www.esa.int/SPECIALS/Launchers_Access_to_Space/SEM6JRS4LZ...

Tags:   ESA European Space Agency european space agency Soyuz rocket launcher dry-run spacecraft Europe's Spaceport

N 1 B 3.3K C 0 E Apr 29, 2011 F May 3, 2011
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

Final testing of the Soyuz launch site at Europe’s Spaceport in French Guiana began on 29 April 2011 with a simulated launch campaign that will end on 5 May 2011.

This dry-run ensures that the Soyuz and the new facilities work together perfectly, while allowing the teams to train under realistic launch conditions. It also validates all the procedures during the final phase before launch.

The vehicle was transferred from the preparation building to the launch zone and erected into the vertical position. The mobile gantry was then rolled out to the pad and the vehicle’s upper composite, comprising the Fregat upper stage and payload fairing, was hoisted on top of the launcher.
Credits: ESA - S. Corvaja, 2011

Fore more information: www.esa.int/SPECIALS/Launchers_Access_to_Space/SEM6JRS4LZ...

Tags:   ESA European Space Agency european space agency Soyuz rocket launcher dry-run spacecraft Europe's Spaceport

N 1 B 3.2K C 0 E Apr 29, 2011 F May 3, 2011
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

Final testing of the Soyuz launch site at Europe’s Spaceport in French Guiana began on 29 April 2011 with a simulated launch campaign that will end on 5 May 2011.

This dry-run ensures that the Soyuz and the new facilities work together perfectly, while allowing the teams to train under realistic launch conditions. It also validates all the procedures during the final phase before launch.

The vehicle was transferred from the preparation building to the launch zone and erected into the vertical position. The mobile gantry was then rolled out to the pad and the vehicle’s upper composite, comprising the Fregat upper stage and payload fairing, was hoisted on top of the launcher.

Credits: ESA - S. Corvaja, 2011

Fore more information: www.esa.int/SPECIALS/Launchers_Access_to_Space/SEM6JRS4LZ...

Tags:   ESA European Space Agency european space agency Soyuz rocket launcher dry-run spacecraft Europe's Spaceport


20.8%