A solo AC44/60CW rebuild is finally on the move west as it leads UP train MASNP-21 down Main Track 2 of the UP KC Metro Sub at Hickory St.
After working Neff, the initial plan was to send this train onto the KCT and through Armourdale in order to bypass 18th St, and they made it as far as the top of The Incline waiting for a signal from KCT West End at Old Union Depot Interlocking. However, the Terminal refused to take the train due clearance issues on the Kaw River Bridge with their high-wide loads, the big cut of military equipment on the head end, so they ended up having to shove clear of Broadway, wait on a couple moves and finally begin moving west out of town, sewing up most of the KC Metro Sub in the process. 12/22/24.
Loading contexts...