Fluidr
about   tools   help   Y   Q   a         b   n   l
User / Moffat Road / Sets / Copper Basin Railway
Mike Danneman / 13 items

N 87 B 2.3K C 4 E Mar 29, 2010 F Jun 3, 2024
  • DESCRIPTION
  • COMMENT
  • MAP
  • O
  • L
  • M

On the early spring day of March 29, 2010, Copper Basin Railway’s empty ore train No. OT-2 curves through Ray Junction. The Gila River is running brown with runoff and wildflowers are sprouting in the high desert around Ray on this beautiful afternoon in Arizona.

Tags:   Copper Basin Copper Basin Railway CBRY ore train OT-2 flowers wildflowers Ray Junction Ray Arizona Gila River spring springtime train railroad AZ

N 41 B 5.7K C 12 E Mar 29, 2010 F Aug 24, 2013
  • DESCRIPTION
  • COMMENT
  • MAP
  • O
  • L
  • M

Copper Basin Railway‘s empty ore train No. OT-2 rumbles through Ray Junction, Arizona, on March 29, 2010. Spring has sprung in the high desert, as the Gila River is running brown and a hillside of flowers soak up the bright sunshine.

Tags:   Copper Basin Railway CBRY empty ore train unit train train OT-2 spring springtime wildflowers Gila River high desert Ray Junction Arizona train railroad AZ

  • DESCRIPTION
  • COMMENT
  • MAP
  • O
  • L
  • M

Just after sunrise at 6:13 a.m. on April 21, 2017, a Copper Basin Railway employee goes about the morning rituals of inspecting and starting some CBRY power for the Smelter Turn.

Tags:   Copper Basin Railway CBRY EMD glint sunrise locomotive morning Hayden Hayden Junction Arizona train railroad AZ

  • DESCRIPTION
  • COMMENT
  • MAP
  • O
  • L
  • M

Copper Basin Railway’s loaded ore train OT-1 exits Tunnel 2 at Ray Junction, Arizona, on April 21, 2017. The desert country is nicely green along the Gila River in springtime.

Tags:   Copper Basin Railway CBRY Copper Basin EMD GP40-2 304 ore train OT-1 Gila River Ray Ray Junction tunnel Arizona Tunnel 2 locomotive AZ

N 107 B 4.0K C 6 E Mar 29, 2010 F May 13, 2022
  • DESCRIPTION
  • COMMENT
  • MAP
  • O
  • L
  • M

Copper Basin Railway’s ore train OT-1 exits short Tunnel 2 just east of Ray Junction, Arizona, on March 29, 2010. CBRY No. 501 is a former Kennecott Copper EMD GP39-2 No. 791 built in October 1978.

Tags:   Copper Basin Railway CBRY Copper Basin Tunnel 2 OT-1 ore train Ray Junction Arizona train railroad locomotive EMD 501 GP39-2 former Kennecott Copper tunnel AZ


38.5%