Fluidr
about   tools   help   Y   Q   a         b   n   l
User / Pepa Quin / RAM WIP 09
Matt De Lanoy / 1,904 items
Now the full lower (brown) wall is 'complete'. I've ironed out a lot of the kinks from my original layout plan and am ready to build up vertically.

The next thing I need to do is figure out the height of this large window wall in the front section. This is the brewery portion of the restaurant, and inside this section can be seen the large vats and machinery.

Not sure how I'm going to do that... perhaps I'll just use those PAB cups. ;)
Popularity
  • Views: 4266
  • Comments: 9
  • Favorites: 3
Dates
  • Taken: May 18, 2012
  • Uploaded: May 25, 2012
  • Updated: May 26, 2012