WSDOT bridge inspectors have red-tagged portions of the wood bridge deck that needs to be replaced. The bridge was built in 1930, widened in 1950 and carries about 4,200 vehicles a day. For more information,
www.wsdot.wa.gov/News/2015/01/28_04bridgerepair.htm.