Heat is applied to a White River Bridge beam during repair work April 9. Heating the beams with a torch in repetitive, heating-and-cooling cycles allows workers to gradually straighten the beams that were discovered to be damaged during a routine inspection. The bridge closed April 4 when bridge engineers discovered the damage, believed to have been caused when an over-height load struck the structure.
Loading contexts...