Fluidr
about   tools   help   Y   Q   a         b   n   l
User / WSDOT / White River Bridge repair heating up
Washington State Dept of Transportation / 33,760 items
Heat is applied to a White River Bridge beam during repair work April 9. Heating the beams with a torch in repetitive, heating-and-cooling cycles allows workers to gradually straighten the beams that were discovered to be damaged during a routine inspection. The bridge closed April 4 when bridge engineers discovered the damage, believed to have been caused when an over-height load struck the structure.
Popularity
  • Views: 4144
  • Comments: 0
  • Favorites: 1
Dates
  • Taken: Apr 9, 2015
  • Uploaded: Apr 10, 2015
  • Updated: Jun 18, 2015