Fluidr
about   tools   help   Y   Q   a         b   n   l
User / WSDOT / US 12 Lewiston-Clarkston Bridge raising
Washington State Dept of Transportation / 33,699 items
US 12 Lewiston-Clarkston Bridge spanning the Snake River and connecting Washington with Idaho is raised to ensure operability as per Coast Guard navigational requirements, July 18, 2019.

The bridge originally was put into operation on Memorial Day in 1939 and is still operational 80 years later.

Popularity
  • Views: 6656
  • Comments: 0
  • Favorites: 2
Dates
  • Taken: Jul 18, 2019
  • Uploaded: Jul 20, 2019
  • Updated: Jul 28, 2019