Fluidr
about
tools
help
Y
Q
a
log in to flickr
b
n
l
FLUIDR
Search
Explore
Surprise
Share
User /
WSDOT
/
New pipes, who dis?
Washington State Dept of Transportation / 33,767 items
ALL
SETS
TAGS
FAVS
CONTACTS
g h j
Washington State Dept of Transportation Some Rights Reserved
Description
Comments
Appears in
EXIF
O
M
L
The drainage pipes installed along 108th Street Northeast are each 18" in diameter and weigh between 1300 and 1400 pounds.
Loading comments...
Loading contexts...
Make:
Apple
Model:
iPhone 6s
Exposure:
0.067 sec (1/15)
Aperture:
f/2.2
ISO Speed:
2000
Focal Length:
4.2 mm
show more
IFD0
Compression:
JPEG (old-style)
Make:
Apple
Model:
iPhone 6s
Orientation:
Horizontal (normal)
X-Resolution:
72 dpi
Y-Resolution:
72 dpi
Resolution Unit:
inches
Software:
12.3.1
Date and Time (Modified):
2019:09:28 04:36:02
YCbCr Positioning:
Centered
ExifIFD
Exposure:
0.067 sec (1/15)
Aperture:
f/2.2
Exposure Program:
Program AE
ISO Speed:
2000
Exif Version:
0221
Date and Time (Original):
2019:09:28 04:36:02
Date and Time (Digitized):
2019:09:28 04:36:02
Components Configuration:
Y, Cb, Cr, -
Brightness Value:
-5.324012314
Exposure Bias:
0 EV
Metering Mode:
Multi-segment
Flash:
Off, Did not fire
Focal Length:
4.2 mm
Subject Area:
2015 1511 2217 1330
Sub Sec Time Original:
620
Sub Sec Time Digitized:
620
Flashpix Version:
0100
Color Space:
sRGB
Sensing Method:
One-chip color area
Scene Type:
Directly photographed
Exposure Mode:
Auto
White Balance:
Auto
Focal Length (35mm format):
29 mm
Scene Capture Type:
Standard
Lens Info:
4.15mm f/2.2
Lens Make:
Apple
Lens Model:
iPhone 6s back camera 4.15mm f/2.2
Popularity
Views:
1729
Comments:
0
Favorites:
0
Dates
Taken:
Sep 28, 2019
Uploaded:
Oct 1, 2019
Updated:
Oct 1, 2019
Tags
washington
wsdot
washington state
marysville
snohomish county
roundabout
construction
highway
highway construction
traffic
travel
pnw
pnwonderland
SR 9
State Route 9
Fluidr requires JavaScript to operate.