Fluidr
about   tools   help   Y   Q   a         b   n   l
User / WSDOT / Crews place overflow pipe under SR 410 - 02/24/23
Washington State Dept of Transportation / 33,726 items
With a section of the roadway excavated, our contractor crews placed the three sections of pipe at a shallow depth beneath SR 410. The existing 24-culvert can be seen under the ice at the right. The three new pipes will handle any overflow from the existing culvert during spring runoff.

More information on SR 410 repairs.
Popularity
  • Views: 3521
  • Comments: 0
  • Favorites: 2
Dates
  • Taken: Feb 24, 2023
  • Uploaded: Mar 3, 2023
  • Updated: Mar 4, 2023