SR 501 in Ridgefield is need of a deep patch roadway repair. Repaving will extend the life of the highway.
More information about this project: wsdot.wa.gov/Projects/SR501/GeeCreekTo56thPaving/
Tags: SR 501 Ridgefield paving ^TH roundabout
Crews from Granite Construction remove several feet of dirt under the existing roadway. This builds a new foundation for the newly paved road. This project will extends the useful life of the pavement, therefore improving safety for drivers who use this stretch of State Route 501.
More Project Info: www.wsdot.wa.gov/projects/sr501/geecreekto56thpaving/
Tags: SR Gee Creek 501 Paving WSDOT Ridgefield ^CD Roundabout
Crews from Granite Construction install Geo fabric and then layer gravel on top of the fabric.
Geo fabric is the back mesh in this photo. It acts as an added layer of strength in the roadway and allows for better drainage.
More project information: www.wsdot.wa.gov/projects/sr501/geecreekto56thpaving/
Tags: SR Gee Creek 501 Paving WSDOT Ridgefield ^CD Roundabout
Roundabout on on 45th Avenue will be paved as part of this project.
In summer 2015, crews will repave and stripe 1.62 miles of roadway in Ridgefield on State Route 501 (Pioneer Street). Repaving will extend the life of the roadway and provide drivers with a safer, smoother ride.
More project information: www.wsdot.wa.gov/projects/sr501/geecreekto56thpaving/
Tags: ^CD SR 501 Ridgefield Roundabout Paving WSDOT