Fluidr
about   tools   help   Y   Q   a         b   n   l
User / WSDOT / Sets / WSDOT High-Speed Rail projects
Washington State Dept of Transportation / 41 items

N 3 B 4.1K C 0 E May 28, 2015 F Jul 6, 2015
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

New tracks, panels and asphalt were installed at this at-grade crossing at the port.

Tags:   Vancouver Rail BL

N 1 B 3.9K C 0 E Jul 6, 2015 F Jul 6, 2015
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

An overview of the Port of Vancouver site where several rail improvements were made to ease congestion between passenger and freight trains.

Tags:   Vancouver Rail BL

N 2 B 3.9K C 0 E May 28, 2015 F Jul 6, 2015
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

The completed rail trench along the Columbia River.

Tags:   Vancouver Rail BL

N 1 B 3.9K C 0 E Jul 6, 2015 F Jul 6, 2015
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

Completed trench before the tracks were added. The pipe bridge also can be seen in the background.

Tags:   Vancouver Rail BL

N 5 B 4.2K C 0 E Jul 6, 2015 F Jul 6, 2015
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

The project added a rail trench along the Columbia River at the port for added train access. (Shown in progress here)

Tags:   Vancouver Rail BL


12.2%