Crews working at Colman Dock’s slip three removed the old vehicle transfer span on July 23. They are replacing this overwater section of the slip and installing a new hydraulic system to raise the new span up and down.

Tags:   ^DR Colman Dock Washington State Ferries WSF Colman Dock Ferries Seattle ferry terminal

N 1 B 1.7K C 0 E Jul 23, 2024 F Jul 23, 2024
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

These towers held the cables and counterweights used to raise and lower the vehicle transfer span at Colman Dock. Crews removed them as part of the project to replace major elements of slip three at the Seattle terminal.

Tags:   ^DR Colman Dock Washington State Ferries WSF Colman Dock Ferries Seattle ferry terminal

N 0 B 1.9K C 0 E Apr 16, 2024 F Jun 6, 2024
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

In this photo from April 2024, the slips are full as work continues on two tribal-named plazas, landscaping, and other final elements of the project.

Tags:   ^DR Colman Dock Washington State Ferries WSF Colman Dock Ferries Seattle ferry terminal

N 0 B 1.9K C 0 E Apr 16, 2024 F Jun 6, 2024
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

In this view of Colman Dock, it's easy to see the pedestrian route from Seattle city streets over the Marion Street bridge on to the ferry terminal.

Tags:   ^DR Colman Dock Washington State Ferries WSF Colman Dock Ferries Seattle ferry terminal

N 0 B 1.7K C 0 E Apr 16, 2024 F Jun 6, 2024
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

A bird's-eye view of the Seattle waterfront and how far we've come at Colman Dock.