Fluidr
about   tools   help   Y   Q   a         b   n   l
User / WSDOT / Sets / July 2016 - Chamber Way overpass closure
Washington State Dept of Transportation / 12 items

N 0 B 14.4K C 0 E Jul 22, 2016 F Jul 22, 2016
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

Damage to the Chamber Way overpass on southbound I-5, caused by a truck hauling a pair of excavators, just south of Olympia, WA.

Tags:   ^cd wsdot I-5 Chehalis Chamber way closure

N 0 B 7.2K C 0 E Jul 22, 2016 F Jul 22, 2016
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

Damage to the Chamber Way overpass on southbound I-5, caused by a truck hauling a pair of excavators, just south of Olympia, WA.

Tags:   overpass ^cd I-5 wsdot freeway Chehalis closure chamber way

N 1 B 4.8K C 0 E Jul 27, 2016 F Jul 27, 2016
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

A portion of the Chamber Way overpass over southbound I-5 was demolished Tuesday, July 26.

The span was damaged on Friday, July 22, when an oversized load hit the span.

WSDOT structural engineers performed a thorough inspection and determined most of the girders supporting the span were irreparable.

More info: www.wsdot.wa.gov/news/2016/07/25/chamber-way-over-southbo...

Tags:   chamber way chehalis I-5 demolition damaged bridge span ^TG

N 5 B 4.8K C 0 E Jul 26, 2016 F Jul 27, 2016
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

A portion of the Chamber Way overpass over southbound I-5 was demolished Tuesday, July 26.

The span was damaged on Friday, July 22, when an oversized load hit the span.

WSDOT structural engineers performed a thorough inspection and determined most of the girders supporting the span were irreparable.

More info: www.wsdot.wa.gov/news/2016/07/25/chamber-way-over-southbo...

Tags:   chamber way chehalis I-5 demolition damaged bridge span ^TG

N 2 B 4.8K C 1 E Jul 26, 2016 F Jul 27, 2016
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

A portion of the Chamber Way overpass over southbound I-5 was demolished Tuesday, July 26.

The span was damaged on Friday, July 22, when an oversized load hit the span.

WSDOT structural engineers performed a thorough inspection and determined most of the girders supporting the span were irreparable.

More info: www.wsdot.wa.gov/news/2016/07/25/chamber-way-over-southbo...

Tags:   chamber way chehalis I-5 demolition damaged bridge span ^TG


41.7%