Fluidr
about   tools   help   Y   Q   a         b   n   l
User / WSDOT / Sets / SR 129 Maintenance
Washington State Dept of Transportation / 5 items

N 3 B 7.3K C 0 E Jul 18, 2019 F Aug 1, 2019
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

A WSDOT employee uses a front end loader to scoop out loose dirt and rocks from the shoulder drainage along State Route 129, south of Clarkston, near the border with Oregon, July 18, 2019.

A front end loader and grader were used to remove fallen rock and soil build up from the shoulder of the road, helping ensure drainage and to help minimize the possibility of rocks ending up on the road surface.

Tags:   SR State Route 129 maintenance July 2019

N 2 B 1.7K C 0 E Jul 18, 2019 F Aug 1, 2019
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

A WSDOT employee uses a front end loader to move loose dirt and rocks from the highway shoulder drainage to a waiting dump truck on State Route 129, south of Clarkston, near the border with Oregon, July 18, 2019.

A front end loader and grader were used to remove fallen rock and soil build up from the shoulder of the road, helping ensure drainage and to help minimize the possibility of rocks ending up on the road surface.

Tags:   SR State Route 129 maintenance July 2019

N 2 B 1.9K C 0 E Jul 18, 2019 F Aug 1, 2019
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

A WSDOT employee looks back at maintenance operations while conducting traffic control on State Route 129, near the border with Oregon, July 18, 2019.

A front end loader and grader were used to remove fallen rock and soil build up from the shoulder of the road, helping ensure drainage and to help minimize the possibility of rocks ending up on the road surface.

Tags:   SR State Route 129 maintenance July 2019

N 3 B 2.1K C 0 E Jul 18, 2019 F Aug 1, 2019
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

A WSDOT employee uses a grader to move loose dirt and rocks from the highway shoulder drainage up onto the highway where a front end loader will scoop up the debris for removal from State Route 129, south of Clarkston, near the border with Oregon, July 18, 2019.

A front end loader and grader were used to remove fallen rock and soil build up from the shoulder of the road, helping ensure drainage and to help minimize the possibility of rocks ending up on the road surface.

Tags:   SR State Route 129 maintenance July 2019

N 4 B 2.3K C 0 E Jul 18, 2019 F Aug 1, 2019
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

WSDOT personnel from the Anatone and Clarkston Maintenance Facilities conduct shoulder maintenance along State Route 129, July 18, 2019.

A front end loader and grader were used to remove fallen rock and soil build up from the shoulder of the road, helping ensure drainage and to help minimize the possibility of rocks ending up on the road surface.

Tags:   SR State Route 129 maintenance July 2019


100%