Fluidr
about   tools   help   Y   Q   a         b   n   l
User / WSDOT / Sets / I-5/SR 526 Sign structure and VMS replacements
Washington State Dept of Transportation / 8 items

N 1 B 1.5K C 0 E Mar 17, 2021 F Mar 17, 2021
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

This map shows the planned detour while eastbound SR 526 near Boeing is closed.

N 1 B 1.7K C 0 E Mar 17, 2021 F Mar 17, 2021
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

This map shows the planned detour while westbound SR 526 near Boeing is closed.

N 1 B 1.9K C 0 E Mar 17, 2021 F Mar 17, 2021
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

This detour map shows the planned detour while the northbound I-5 ramps to SR 526 and SR 527/99 are closed.

N 1 B 10.8K C 0 E Mar 17, 2021 F Mar 17, 2021
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

A look at the new variable message sign (VMS) on northbound I-5 south of SR 526.

N 2 B 1.6K C 1 E Mar 22, 2021 F Apr 7, 2021
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

Pieces of a new sign bridge were assembled on SR 526 in Everett.

Tags:   JC Sign bridge construction closure SR526 Everett Boeing


62.5%