Fluidr
about   tools   help   Y   Q   a         b   n   l
User / WSDOT / Sets / 2024 SR 20 North Cascades spring clearing
Washington State Dept of Transportation / 37 items

N 0 B 6.6K C 0 E Mar 27, 2024 F Mar 29, 2024
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

Spring clearing has started on SR 20 west of Silver Star (milepost 171) and the blower is the perfect piece of equipment to move the snow pack on the roadway.

Tags:   #SR20NCH #mountain pass #snow #avalanche #cascades #northcross LL

  • DESCRIPTION
  • COMMENT
  • MAP
  • O
  • L
  • M

The eastside clearing crew made it through Spire Gulch and nearly through the Liberty Bell avalanche paths on the second week of the 2024 SR 20 North Cascades spring clearing.

Tags:   #SR20NCH #mountain pass #snow #avalanche #cascades #northcross LL

  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

One of the avalanche control crew captured this image on the 2024 North Cascades spring assessment day, March 5, 2o24

Tags:   #SR20NCH #mountain pass #snow #avalanche #cascades #northcross LL

  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

A crew member considers the ice pack on the roadway, along with snow pack depth and conditions, and the spring forecast to make an assessment about when to start spring clearing of SR 20 between milepost 134-171. 2024 spring clearing started March 25.

Tags:   #SR20NCH #mountain pass #snow #avalanche #cascades #northcross LL

  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

There's still plenty of snow and debris in the Liberty Bell avalanche paths on SR 20 Washington Pass. Avalanche control is schedule prior to the spring opening of the highway.

Tags:   #SR20NCH #mountain pass #snow #avalanche #cascades #northcross LL


13.5%