Fluidr
about   tools   help   Y   Q   a         b   n   l
User / WSDOT / Sets / US 12 Lewiston-Clarkston Bridge
Washington State Dept of Transportation / 3 items

N 2 B 6.7K C 0 E Jul 18, 2019 F Jul 20, 2019
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

US 12 Lewiston-Clarkston Bridge spanning the Snake River and connecting Washington with Idaho is raised to ensure operability as per Coast Guard navigational requirements, July 18, 2019.

The bridge originally was put into operation on Memorial Day in 1939 and is still operational 80 years later.

Tags:   US 12 Lewiston-Clarkston Bridge Washington Idaho July 2019 Snake River ^DM

N 2 B 1.3K C 0 E Jul 18, 2019 F Jul 20, 2019
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

WSDOT personnel inspect the US 12 Lewiston-Clarkston Bridge spanning the Snake River to ensure operability as per Coast Guard navigational requirements, July 18, 2019.

The bridge originally was put into operation on Memorial Day in 1939 and is still operational 80 years later.

Tags:   US 12 Lewiston-Clarkston Bridge Washington Idaho July 2019 Snake River ^DM

N 1 B 1.3K C 0 E Jul 18, 2019 F Jul 20, 2019
  • DESCRIPTION
  • COMMENT
  • O
  • L
  • M

US 12 Lewiston-Clarkston Bridge spanning the Snake River and connecting Washington with Idaho is raised to ensure operability as per Coast Guard navigational requirements, July 18, 2019.

The bridge originally was put into operation on Memorial Day in 1939 and is still operational 80 years later.

Tags:   US 12 Lewiston-Clarkston Bridge Washington Idaho July 2019 Snake River ^DM


100%